The challenge

  • Outdated air conditioning systems were inefficient, unreliable and driving up energy costs across the estate.

  • High volumes of reactive callouts and inconsistent performance were impacting customer comfort and operational costs.

  • The consortium required a modern, energy efficient solution with minimal disruption and full environmental compliance.

Services delivered

  • Air conditioning system replacement
  • Energy efficient upgrade
  • Removal & responsible recycling
  • Testing, commissioning & handover
  • Planned maintenance inclusion

Our solution

  1. 1

    We designed and delivered a phased replacement programme across 25 sites within 8 weeks, ensuring minimal disruption to trading and maximum operational continuity.

  2. 2

    All existing systems were safely removed and 100% of refrigerants, metals and plastics were recovered and recycled through licensed, environmentally responsible partners.

  3. 3

    We installed high efficiency, low GWP systems with smart controls, reducing energy demand and improving system reliability.

  4. 4

    All systems were tested, commissioned and documented, with PPM schedules added to our JobLogic platform for ongoing compliance and performance monitoring.

Project outcomes

32%

Reduction in energy use

100%

Systems fully compliant

100%

Environmentally responsible recycling

Improved customer comfort & experience

Reduced running costs & improved budget certainty