Office Refurbishment Project

A coordinated office refurbishment connecting workplace improvements with energy efficiency and infrastructure performance.

Office Refurbishment Project
Sector
Manufacturing
Timeline
4 weeks
Scope
Full office refurbishment

The challenge

  • Element delivered a full office refurbishment to modernise the workspace, improve efficiency and support future growth.

  • The client's 20-year-old office needed a complete refresh. Existing cabling and power were outdated.

  • HVAC units were inefficient, leading to high energy costs and poor comfort.

  • The overall décor no longer reflected the company's brand image.

Services delivered

  • Structured cabling
  • Lighting
  • Small power
  • Redecoration
  • HVAC installation

Our solution

  1. 1

    We delivered a fully managed refurbishment programme, coordinating multiple service lines under one project lead.

  2. 2

    Element installed Cat6 cabling throughout, ensuring fast, reliable connectivity to support hybrid working.

  3. 3

    We reconfigured and upgraded power distribution, adding additional outlets and underfloor boxes for flexible desk layouts.

  4. 4

    We supplied and fitted modern, energy-efficient air conditioning units to improve air quality and thermal comfort, and reduce energy costs.

  5. 5

    We completed a full interior refresh to create a modern, professional and inspiring environment.

Project outcomes

25%

Reduction in energy consumption through upgraded HVAC

Higher network performance & reliability

Flexible power for hot-desking and agile working

Improved staff satisfaction & wellbeing

Lower running costs & long term savings

“A professional, modern, and comfortable office environment.”
— Post-project staff feedback